The 90-day B2B support onboarding checklist
From pre-boarding to full certification: The 90-day B2B support onboarding checklist
Every box a new agent should hit on the way to independent productivity, with AI-native tools woven in from day one.
Day 0: Pre-boarding
Goal: Every administrative and access task completed before the new hire's first day, so they can focus on learning from hour one.
- Offer letter signed and returned
- Tax and employment paperwork submitted
- Background check cleared
- Hardware shipped or ready (laptop, monitor, headset, peripherals)
- System access provisioned: ticketing platform
- System access provisioned: CRM
- System access provisioned: knowledge base or wiki
- System access provisioned: AI agent assist
- System access provisioned: observability and escalation tools
- System access provisioned: communication tools (Slack, email, video)
- Welcome email sent with day-one logistics (start time, location or Zoom link, dress code, what to bring)
- Buddy or mentor assigned and notified
- Day-one calendar prepared (orientation, intro meetings, team lunch)
Days 1–15: Foundations and product immersion
Goal: Build the foundation. New hire should focus on company context, product depth, and tooling fluency — no live customer tickets yet.
Gate at day 15: Foundations certification (written and practical assessment on product fundamentals and tooling fluency).
- Company orientation completed (mission, customers, ICP)
- Customer segments overview reviewed
- Product walkthrough across major modules completed
- Tooling fluency: ticketing system training complete
- Tooling fluency: CRM training complete
- Tooling fluency: knowledge platform training complete
- Tooling fluency: AI agent assist introduced and used
- Tooling fluency: observability and escalation tools training complete
- Team troubleshooting frameworks reviewed
- Sandboxed ticket practice completed (target: 20 tickets)
- Gold tickets studied (target: 10 case walkthroughs)
- Foundations certification: written assessment passed
- Foundations certification: practical assessment passed
Days 16–45: Supervised ticket handling
Goal: Handle live tickets with supervision. Senior rep reviews every closed ticket before customer response goes out.
Gate at day 45: Tier-1 certification (independent close of a defined set of tier-1 ticket types at team-average CSAT).
- First live tier-1 ticket handled (with senior review)
- Tier-1 ticket types curriculum complete
- Escalation paths reviewed and understood
- Customer communication standards reviewed
- Mentorship sessions scheduled (2x weekly cadence established)
- 50+ tier-1 tickets closed under senior review
- Tier-1 certification: passed
Days 46–75: Nesting and independence with safety nets
Goal: Transition from supervised practice to independent ownership. Senior rep review shifts from every ticket to exception-based.
Gate at day 75: Tier-2 readiness (demonstrate ability to handle a defined set of tier-2 cases).
- Tier-1 independent operation confirmed
- Tier-2 ticket types curriculum complete
- Cross-functional collaboration: engineering interface introduction
- Cross-functional collaboration: CS interface introduction
- Cross-functional collaboration: sales interface introduction
- Edge case scenarios studied (gold tickets review)
- Senior rep review shifted to exception-based
- Mentorship sessions: weekly cadence
- Tier-2 readiness assessment passed
Days 76–90: Full productivity and certification
Goal: Operate at or near team average across the metrics defined in the program. Reinforce capability and lock in long-term habits.
Gate at day 90: Full certification (signed off as fully ramped, with documented metrics meeting the team's productivity bar).
- CSAT within 5 points of team average
- First contact resolution within 10 points of team average
- Time to first solo ticket: documented
- Tickets closed per week at the team-average benchmark
- Specialty area assignment (if applicable)
- Manager 1:1 cadence transitions to standard team rhythm
- Full certification: signed off by manager
- 30-day post-onboarding retrospective scheduled
Fully certified
Every milestone hit from pre-boarding through day 90. Time to formally close out the program and schedule the 30-day retrospective.